In accordance with European Commission Implementing Regulation No 923/2012 (SERA) a flight plan shall be submitted prior to operating:
Flight plan shall be submitted not more than 120 hours before flight's EOBT. If the flight plan is submitted earlier than 24 hours before the EOBT, the date of flight shall be inserted in flight plan's field 18 after DOF/.
Flight plan shall be submitted at least (or no later than) 60 minutes before EOBT in flight plan.
For flights that may be subject to ATFM measures, the flight plan must be submitted at least 3 hours before the EOBT.
For the VFR flight not crossing the border of Republic of Estonia, the flight plan shall be submitted at least 30 minutes before EOBT in flight plan.
If the flight plan is submitted during flight, it must be done sufficiently in advance to be received by concerned air traffic service unit 10 minutes before estimated time of arrival to:
Flight plan requirements for flights subject to ATFM procedures are given in ENR 1.9.
Flight plan shall be submitted before departure to the ATS reporting office (ARO) or during flight to a corresponding ATS unit.
ATS reporting office (ARO) for all Estonian aerodromes is centralised ARO and it is the central unit for accepting, processing and transmitting flight plans and flight plan related messages.
Flight plans shall be preferably submitted before departure to the centralised ARO:
Tel: | +372 671 0241 |
Tel: | +372 5826 7100 (back-up) |
E-mail: | fpl.tugi@eans.ee |
When submitting a flight plan by phone, the sequence of fields in the ICAO flight plan form shall be followed.
Flight plans can be submitted via the Estonian centralised ARO web-based application (https://isb.eans.ee).
Flight plans may also be submitted to the following units before departure:
IFR or mixed flight rules IFR/VFR flight plans and associated messages (CHG, DLA, CNL) may be submitted directly to IFPS, as described in ENR 1.11, subject to the procedures described in the IFPS Users Manual. Direct submitters are fully responsible for complying with the applicable IFPZ procedures, including full addressing of the VFR and OAT parts of an IFPZ flight.
If a flight plan submitter uses a computerised flight plan transfer system other than the Estonian centralised ARO web-based application to submit flight plans, the responsibility for correctness and addressing of the flight plan form lies with the submitter.
Airspace users operating according to FRA procedures are permitted to cross Tallinn FIR BDRY between Riga FIR and Helsinki FIR according to published FRA procedures of Estonia, Latvia and Finland.
Submitting of flight flans for flights in Bodø OFIR shall be in accordance with the flight planning rules in ICAO Doc 7030, NAT section.
A single permit shall be obtained from the Estonian Transport Administration to organise air races or public aviation events and to conduct flights where it is impossible to follow the rules of the air, or other extraordinary flights.
A request for authorisation shall be mailed so as to be received at least one week before the intended day of operation to:
Post: | Estonian Transport Administration Lõõtsa 5 11415 Tallinn, ESTONIA |
Tel: | +372 610 3500 |
Fax: | +372 610 3501 |
E-mail: | info@transpordiamet.ee |
NIL
Note: If a delay in departure (or cancellation) of an uncontrolled VFR flight is not properly reported, alerting or search and rescue action may be unnecessarily initiated when the flight fails to arrive at the destination aerodrome within 30 minutes after its current ETA.
Whenever a flight, for which a flight plan has been submitted, is cancelled, it shall be informed immediately:
In order to initiate ATS services an IFR or VFR flight plan (if submitted) must be activated by one of the following means.
If a departure takes place from an aerodrome or operating site without any ATS in operation, the pilot shall activate the FPL:
Tel: | +372 625 8374 |
Tel: | +372 5826 7100 (back-up) |
AFS: | EETTZFZX |
If a departure takes place from an operating site located inside a CTR or FIZ, the pilot shall contact the appropriate TWR or AFIS unit by phone or by radio before departure.
The activation message shall contain the following elements of information:
An activation message is not required when the aerodrome is provided with ATS and it is evident that the departure has been observed.
An arrival report shall be made after landing on an aerodrome or operating site where ATS is not provided by any IFR or VFR flight for which an FPL has been activated.
The arrival report shall be made at the earliest possible moment after landing but not later than ETA+30 minutes to Flight Data Assistant (FDA):
Tel: | +372 625 8374 |
Tel: | +372 5826 7100 (back-up) |
AFS: | EETTZFZX |
If a landing takes place to an operating site located inside a CTR or FIZ, the report shall be made to the appropriate TWR või AFIS unit by phone or by radio.
The report is not required after landing when the aerodrome is provided with ATS and it is evident that the landing has been observed.
The arrival report shall contain the following elements of information:
VFR flight plan in uncontrolled airspace submitted only for a portion of a flight, or when a pilot decides to close an active flight plan mid-air, shall be closed by radio to the relevant ATS unit.
Whenever an arrival report is required, failure to comply with the requirement may cause serious disruption in the air traffic services and incur great expenses in carrying out unnecessary search and rescue operations.